GOLDEN GATE DR DRILLS
DR DRILL ACTIVITY(Switch Over)
-------------------------------------------------------------------------------------------------------------------
Compare all parameters all parameter files between both Production and DR server.
stop and start extract process on production server(after doing this process size of new generated file are smaller ,it will consume less amount of time while uploading on dr )
stop all the process at production server.
Copy the BR,DIRCHK ,DIRDAT(Copy the latest trails files of each name from dirdat ) files from Production server.
Cross check once ,On Dr Server file inside the DIRDAT must be older than new DIRDAT files which are copied from Production Server.
Delete the old files and upload the latest trail files inside DIRDAT
Start all Process on DR server.
DR DRILL ACTIVITY(Switch Back)
-------------------------------------------------------------------------------------------------------------------
Compare all parameters all parameter files between both DR and Production server.
stop and start extract process on DR server(after doing this process size of new generated file are smaller ,it will consume less amount of time while uploading on dr )
stop all the process at DR server.
Copy the BR,DIRCHK ,DIRDAT(Copy the latest trails files of each name from dirdat ) files from DR server.
Cross check once ,On Production Server file inside the DIRDAT must be older than new DIRDAT files which are copied from DR Server.
Delete the old files and upload the latest trail files inside DIRDAT
Start all Process on Production Server.
DR DRILL ACTIVITY IN GOLDENGATE:
================================
-----------profund drdril swithback --------------------- 23 standby to 155 primary
23
1) info all -- check lag on each process
2) check the cross check parameter on every process between 23 to 155
3) info EPROF1
check extract process on 23 in sync with time and date
4) stop EPROF1
stop extract process
5) info EPROF1
check extract prcess status
6) info all verfiy process stop
7) start EPROF1
start e* -- becouse for transfer the file we need small size file
8) info all
and wait for lag clear
9) stop EPROF1 --- stope extract
10 ) check the extract status
info all
11) stop * -- stop every prcesss
12) stop mgr --- 13) verify status for every process -- info all info
=================
ON - 127
1) info all
check all prcesses running
2) stop p* stop pump
check pump status info all or info p* 3) start p* check pump status info all or info p* 4) stop p* stop pump
check pump status
5) chenge pointing on pump
edit param PICPR1
23 to 155
6) view param PICPR1 check the changes made in file
7) check info all
===========
then create folder on desktop
on arcos --- 23 open
click on arcos
take stfp and click on user and op_tsg5 connect on arocs for file transfer
and copy deskstop file location and paste on arcos
1) copy -- BR file form 23 arcos gg_home to and paste on desktop file on arcos
2) copy -- dirchk file form 23 arcos gg_home to and paste on desktop file on arcos
3) take latest taril file with small file size and form dirdat and paste on desktop file on arcos
i1 and pa files
4) check the file size and date and time and imp details
when we need to start process at complete activity from 23 to 155
----- 155
start mgr - - start mgr on 155
start e* ---- start every process on 155
127
start p* start pump
155
start * start extract on 155
alter extract EPROF1 , scn
=====================
10.16.12.155 profund prm
10.52.50.127 - ICMS
10.75.3.23 - profund stb
stop e* on stb
start e*
info all
stop e*
on ICMS 27
stop p*
start p*
info all
stop p*
start p*
on 23 stb
stop * (all process)
stop mgr
connect to smtf file transfer
copy BR file from standby to PRM (Becoz new stb should know from where to start extract process it will
recovery of the process Boundry recovery)
and on old stb rename the BR file as a BR_03_8_24 for record purpose
copy the checkpoint directory from stb to prm (To know from where to all the process start on new stb )
and rename the olde chk as chk_03_08_24
copy the latest small size trail files of extract and pump processes from stb to prm check proper date and copy it.
after that delete all the trail files from dirdat location of prm;
then those 2copied trail files paste in the cleared location prm (from stb to prm )
on PUMP 27 make change in rmthost now new stb is 155
rmthost 10.16.12.155
--rmthost 10.75.3.23
wait for confirmation from app team once the db is connected to new prm db now we can start the process :
start mgr on new stb 155
start e*
on 27 start p*
on new stb 155
start * (all process start )
if extract abend abend alter from recent scn
alter extract ext1 ,scn 123378
on 155 edit param pump need to change send the data to ICMS 127
--rmthost 10.78.202.218
rmthost 10.52.50.127
start p*
Comments
Post a Comment